EasyManua.ls Logo

EZ-ACCESS TITAN User Manual

EZ-ACCESS TITAN
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Manufactured in the USA
3-YEAR WARRANTY. Please register at www.ezaccess.com/warranty-satisfaction.
© EZ-ACCESS
®
, a division of Homecare Products, Inc. All rights reserved.
All text and images contained in this document are proprietary and may not be shared, modified, distributed,
reproduced, or reused without the express written permission of EZ-ACCESS.
17845 02-28-2020
Installation Manual
TITAN
Code Compliant
Modular Access System
Image shown with multiple ramp and
platform rail options.

Table of Contents

Other manuals for EZ-ACCESS TITAN

Question and Answer IconNeed help?

Do you have a question about the EZ-ACCESS TITAN and is the answer not in the manual?

EZ-ACCESS TITAN Specifications

General IconGeneral
BrandEZ-ACCESS
ModelTITAN
CategoryLifting Systems
LanguageEnglish

Summary

PLATFORMS

INSTALL PLATFORMS

Steps for installing platform sections in straight or turn configurations.

INSTALL SUPPORT LEGS AND FEET AND ADJUST PLATFORM HEIGHT

Procedure for attaching and adjusting platform support legs for desired height.

CONNECT TWO PLATFORMS TOGETHER

Instructions for securely joining two platform units.

RAMPS

INSTALL RAMPS ON PLATFORMS

Instructions on how to attach ramps to platform structures.

ATTACH SUPPORT LEGS TO RAMPS

Procedure for attaching support legs to ramp assemblies.

HANDRAILS

RAMP HANDRAILS

Installing the main handrail components onto the ramp frame.

INSTALL TWO-LINE PLATFORM RAILS AND PICKETED GUARDS

Attaching assembled platform rails and guards to the platform.

CLOSURES

TWO-LINE RAIL TURN BACK CLOSURE

Installing two-line rail closures for turn-back ramp configurations.

PICKETED GUARD TURN BACK CLOSURE

Installing picketed guard closures for turn-back ramp configurations.

TWO-LINE RAIL CORNER TURN

Steps for installing two-line rail closures in corner turn configurations.

PICKETED GUARD CORNER TURN

Steps for installing picketed guard closures in corner turn configurations.

FINAL PLATFORM/RAMP STEPS AND CHECKS

ATTACH FRAME POSTS TO PLATFORM POSTS

Connecting ramp frame posts to platform angle posts.

FINAL CHECKS

Performing final inspections and checks on the assembled system.

SECURE RAMPS TO PLATFORMS

Final step to secure ramps to platforms using end clips.

MAINTENANCE

PERIODIC MAINTENANCE

Routine checks and upkeep procedures for the ramp system.

Related product manuals