5.12. THREE PLATFORM DECK CORNER CLOSURE
The three platform deck corner closure is required wherever three platforms are assembled in an
inside corner, regardless of whether the corner includes a closure, guard, or two-line rail.
5.12.1. After assembling the platform picketed guards or two line rails (or other closure
component if present), but before any of the handrail components, install a platform
angle post in the open corner pocket at the corner (FIG. 5.52) and secure in place in
the same manner as described in ‘ASSEMBLE TWO-LINE PLATFORM RAILS AND
PICKETED GUARDS’ section.
FIG. 5.52

Table of Contents

Other manuals for EZ-ACCESS TITAN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EZ-ACCESS TITAN and is the answer not in the manual?

EZ-ACCESS TITAN Specifications

General IconGeneral
BrandEZ-ACCESS
ModelTITAN
CategoryLifting Systems
LanguageEnglish

Related product manuals