4.7.6. Install 5/16”-18 x 1” long hex bolts through a 5/16” flat washer for the top rail, mid
rail, and platform angle post of the “first” frame and through the angle post of the
“first” frame only for the barrier (do not use a flat washer on the lowermost hole) into
the threaded inserts in the top rail, mid rail and barrier of the “second″ frame (FIG.
4.12).
4.7.7. Tighten all fasteners securely, including the angle post set screws under the platform
deck and the assembly fasteners of the two-line rails or picketed guards which were
assembled loosely in an earlier section.
FIG. 4.12
4.8. CONVERT TWO-LINE PLATFORM RAILS TO PICKETED GUARDS
4.8.1. To convert a two-line rail to a picketed guard in the field, leave the top rail in place but
loosen the attachment bolts on both sides.
4.8.2. Remove attachment bolts for mid rail and barrier on both sides. Remove mid rail and
barrier.
4.8.3. Install the picketed guard in the same manner described in ‘ASSEMBLE TWO-LINE
PLATFORM RAILS AND PICKETED GUARDS’ section.
4.8.4. Repeat for all sections requiring conversion.

Table of Contents

Other manuals for EZ-ACCESS TITAN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EZ-ACCESS TITAN and is the answer not in the manual?

EZ-ACCESS TITAN Specifications

General IconGeneral
BrandEZ-ACCESS
ModelTITAN
CategoryLifting Systems
LanguageEnglish

Related product manuals