EasyManua.ls Logo

Faema E71 - Daily Machine Operation; Starting the Machine and Heating

Faema E71
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
3
2
ON
4
CHECK BOILER
English
11 EN
Press the backlit main switch to turn on the machine.
The preset working pressure must be reached before the
machine is ready for use.
During this phase, the boilers are loaded and the heating
phase begins.
If one of the
keys is pressed,
coffee will be served at the temperature
reached at that moment.
All of the other keys are disabled
because the working pressure has not
been reached.
While waiting for the machine to be
UHDG\IRUXVHLQVHUWWKH ¿OWHUKROGHUV
in the units.
10. Daily operation
USE
“Before setting the machine to work, make sure that:
the main electric power switch is on;
the mains water tap has been turned on".

Table of Contents

Related product manuals