FERROLI F30
2
1
8. Install the inner metal fl ue into the outlet, up to
the wallplate fl ange mark.
9. Lift boiler with fl ue in place, engage inner and
outer fl ue, slide into position
9. Make sure the inner fl ue is fully engaged in
the fl ue terminal, secure boiler with two nuts
and washers, sevure bottom of boiler using two
screws and washers.
80 mm
36 mm
Fig. 22h
Fig. 22i