EasyManua.ls Logo

Finkbeiner EHB702 - Page 18

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Labels
Walter Finkbeiner GmbH
Alte Poststrasse 9/11
72250 Freudenstadt / Germany
www.finkbeiner.eu
18 / 56
PB-BA-EHB702-102GB
22.02.2011
Short operation instructions
Short operation instructions – Mobile Column Lift EHB / GAB
Installation
Locate columns on a level and sufficient load-bearing surface.
Plug together columns by interconnect cables from column to column in a circuit around
the vehicle.
Operation
Operation only by adult and authorised persons instructed in the handling of the lift.
Plug-in power supply plug into prescribed mains (clockwise phase sequence!).
Switch-on main switch, press START-button.
Press UP respective DOWN.
Load support
Do not exceed admissible capacity of the lift.
Attach columns at the wheels respective pick-up points specified by vehicle manufacturer; always
two columns at one common axle.
Check safe lifting of the vehicle immediately after load pick-up.
To regard during operation
The operating person must not stand underneath the load during operation and has to observe
sufficient safety clearance towards the moving parts of the lift.
The operating person has to pay attention that the movement area of the lift is free from any
obstacles and that no persons stay therein.
The operating person has to supervise constantly the lift and the lifted load and has to stop
operation immediately if anything is working not correctly.
Do not ride on the lifted vehicle or on the load attachments.
Do not climb up the lift or the lifted vehicle.
After operation the main switch has to be switched-off and locked against unauthorised use.
Regard Operation Manual of the lift.

Table of Contents