FIRST STOP SAFETY 22
MemoryPAT-Blu Issue 1.2
For mains extension leads up to 1 metre in length press the Power cord button.
The MemoryPAT-Blu will run through the tests and the results for Earth
Continuity, Insulation Resistance and Polarity will be displayed as well an overall
Pass or Fail as shown below.
Once the testing is complete, record the results and the unique test number in
the Test Record.
Note: On a multi-way mains extension lead, make sure that you check all the
socket outlets.
TESTING LONG EXTENSION LEADS (LONGER THAN 1 METRE)
Plug the long extension lead into the MemoryPAT-Blu. Plug the adaptor into one
of the sockets of the extension lead and also into the IEC testing socket on the
MemoryPAT-Blu.