8.1.2. Standard emptying:
Complete emptying of the basin depends on the following Timers*:
Timer T05 (Min. NEVER / Max. 24h)
While the equipment is running, it is fully emptied periodically
according to the time value set in T05.
Timer T06 (min. 0 h / Max. 24h)
The delay time for complete emptying is set according to the
time value in T06, with the equipment switched off.
8.1.3. No emptying (never):
The basin is never emptied
*These Timers are configured in chapter 7 “Settings”.
8.2. Configuration Prior to Start-Up (Pre-Start-up)
The pre-start-up process can be enabled and the number of cycles to be repeated specified.
This process consists of carrying out the following repeat cycles for the number of times established:
Keep the water recirculation pump running for 10 minutes then empty the basin for 10 minutes.
This process cleans dust produced in the manufacturing process from the panel.
During the pre-start-up cycle, the duct fans for the air to be treated must be turned off. The UV lamp
must not be switched on during this process.
Once this function is enabled, the equipment must be started at the Manual mode (MAN) to proceed
with the start-up cycles.
The following control options are available:
Enabled:
Enables the start-up process
Disabled(*):
Enables the start-up process
No. cycles :( min. 0 cycles /Max. 10 cycles)
Sets the start-up process cycles number.
The factory set value is 6 cycles
(*) Once this function is enabled, the equipment must be started in manual mode