Installing Glycerine Solution in Product Simulation Bottle
(glycerine not included - P/N00959296)
ATTENTION INSTALLER
§ It is imperative that the top/bottom probe bottle be lled with a solution
that your facility uses to ensure proper operation of unit.
§ Units are equipped with a third-party monitor installation port.
Customers are required to refer to CDC Vaccine and Handling Toolkit
(cdc.gov) for proper placement of the probe within the cabinet to
ensure proper performance.
§ NSF 456 requires the temperature display probe to be replaced or
recalibrated. Follett recommends replacement/recalibration 12 months
from the original date of calibration on the Certicate of Traceability
supplied with your equipment at the time of purchase. Recalibration
or purchasing a new calibrated probe is not covered by the original
equipment warranty. To purchase a new Probe with Certicate of
Traceability, please contact our Parts Department @ 1-877-612-5086 or
partsales@follettice.com
1. Remove the bottle from the bracket located in the upper left side
of the refrigerator (Fig. 16).
2. Remove the top and ll the bottle with a 50/50 solution of glycerine
and water.
3. Replace the top (and probe).
4. Reinsert bottle into the bracket.
Fig. 14
Turn on Power
1. Move power switch, located on the bottom left of unit, to the ON
position.
Fig. 15
REFVAC4P, REFVAC5P Undercounter Refrigerators 9