070.250-IOM1 (NOV 2013)
Page 27
TDS_ Rotary Screw Compressor
Installation - Operation - Maintenance
Index
A
accumulator, 3
allowableangeloads,13
antifriction bearings, 6
ASHRAE, 3
B
balance piston, 6
balance piston pressure regulator, 17
bare compressor, 21
C
capacity control, 6
compressor operating log sheet, 25
compressor port locations, 8
compressor prestart checklist, 24
compressor shaft seal, 6
condensation, 3, 14
coolware™, 3
corrosion, 5, 12
coupling, 21
customer connections, 13
D
dimensions, 7
discharge pressure, 6
discharge temperature, 3
drive coupling, 21
drive train alignment, 25
dry nitrogen, 12
E
evacuation lines, 5
F
female rotor, 6
foundation, 12
G
gaskets, 21
H
holding charge, 12
hydrocarbon gasses, 3
I
identicationdataplate,3
installation, 7
insulated, 17
L
lifting rings, 12
load surges, 3
long term storage, 4
lubrication system, 5
M
maintenance, 19
male rotor, 6
male rotor shaft, 5
motor, 21, 25
O
oil analysis, 20
oil cooling system, 18
oilltercartridges,19
oillters,14, 19
oil heater(s), 15
oil pressure, 6, 14
oil quality, 20
oil seal, 6
oil strainer elements, 19
oil supply, 6
operating log, 21
orice,17
over-compression, 6
P
pipe hangers, 13
piping layouts, 3
piping stress, 13
potentiometer, 16
pressure ratio, 6
prestart checklist, 24
R
rigging and handling, 12
rotor housing, 6
S
serial number, 3
shaft alignment, 21
shipping gauges, 12
shutdown, 19
slide stop, 6
slide valve, 6
starter operating log sheet, 25
start-up, 17, 24
storage, 12
suction accumulator, 19
suction line, 3
suction strainer, 18, 19
T
thermal stability, 6
traps, 3
troubleshooting, 19
troubleshooting
ltercartridges,23
oil pressure, 23
oil pressure regulator, 23
pressure regulating valve, 23
pump, 23
pump strainer, 23
service valves, 23
strainer, 23
U
under-compression, 6
unloading, 6
V
vacuum, 5
vapor pump, 3
vibration analysis, 18, 20
vibration level, 19
volume ratio, 17
W
warranty, 4
water vapor, 19