EasyManua.ls Logo

FriFri Basic 411 - Page 39

FriFri Basic 411
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
© frifri Aro SA 5-15 OM - 1.0 - 25.10.2004
10. Press the membrane switch to start the frying oil pump. Wait until the whole quantity of frying oil has been pumped into
the frying vessel and if necessary interrupt or terminate the pumping process by pressing the membrane switch again.
11. Remove inlet nozzle.
CAUTION
Do not allow frying oil pump to run dry.
If the frying oil pump inadvertently runs dry it will be switched off automatically by the controller af-
ter 3 minutes to avoid damage.
Membrane
switch
Display / setting

Table of Contents

Related product manuals