Operating the system
Assembly and initial startup
Fröling Heizkessel- und Behälterbau Ges.m.b.H
Industriestraße 12 A-4710 Grieskirchen Page 21
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com B 067 03 11_en
3 Operating the system
3.1 Assembly and initial startup
Assembly, installation and initial startup of the boiler must only be
carried out by qualified staff, and these procedures are described in the
accompanying assembly instructions.
See TX assembly instructions
NOTICE
Optimum efficiency and efficient, low-emission operation can
only be guaranteed if the system is set up by trained
professionals and observing the standard factory settings.
Take the following precautions:
Initial start-up should be carried out with an authorised installer or with
Fröling customer services.
3.2 Filling/ refilling the store with fuel
When you fill the store you should always ensure that you are using the
right fuel:
Page 12, 2.4.2