1
Unlock the strain-relief device with a
slotted screwdriver by pressing on the
sides.
2
Open the strain-relief device.
3
Remove the mains cable.
Install the 2 kW
mains cable
1
Insert the mains cable into the strain-
relief device.
2
Close the strain-relief device by press-
ing firmly.
1
Route the mains cable and strain-relief
device through the opening in the AC
connection plate. Make sure that the
strain-relief device locking hooks are
fully engaged.
23
EN