Chapter 2 Installation
2.3 Installing in a Rack
FUJITSU Storage ETERNUS DX, ETERNUS AF Configuration Guide (Power Synchronized Unit)
Copyright 2017 FUJITSU LIMITED P3AM-8012-10ENZ0
36
2.3.1 Installing a Power Synchronized Unit
This section describes how to install a power synchronized unit in a rack.
■ Checking the package contents of the rack mount kit
Check the following package contents to confirm that there are no missing parts. If there are missing parts,
contact your sales representative.
■ Procedure for installing a power synchronized unit
1 Open the front and rear doors of the rack.
2 Attach the M6 cage nuts to the rear rack pillar.
• Attachment positions
Insert four M6 cage nuts in the 1st and 3rd holes above the power synchronized unit base line.
❏ L-shaped bracket: 2
Same for right and left.
❏ M3 flat head screw: 4
For attaching L-shaped
brackets
❏ M6 cage nut: 4
Used when the holes in the rack
pillars are square
❏ M6 cross recessed head screw
with captive washer: 4
❏ Blank panel: 1
(Rear rack pillars)
Base line of
power synchronized unit
1st position
3rd position
1U (power synchronized unit size)