EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S5 - Page 44

Fujitsu PRIMERGY RX300 S5
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 Operating manual RX300 S5
Installing/removing the server in/from the rack Hardware installation
Installation of the cable management is described in detail in the Technical
Manual for the respective rack.
3rd party racks
Certain general conditions must be met:
Installation dimensions (see the dimensions shown in figure 6 on page 45):
1 Front of rack
2 Rear of rack
A Rack depth (comparison PRIMECENTER Rack 940/1000/1100 mm)
B Rack width (comparison PRIMECENTER rack 700 mm)
C Clearance for 19" installation level
C1 Front 19" installation level
C2 Rear 19" installation level
D Cable routing area (cable area depth) and ventilation
E Space for front panel and ventilation
F Space for right and left support systems
P PRIMERGY server installation depth
a1 Front left support upright
a2 Front right support upright
b1 Rear left support upright
b2 Rear right support upright

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S5

Related product manuals