EasyManua.ls Logo

FULTON FT-0800C - Gasket Installation Instructions

FULTON FT-0800C
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FT-C Vertical Electric Thermal Fluid Heater Manual 12 2013 ISSUE 1




1. Lubricate nuts, bolts and washers with a graphite/oil mixture.
2. Assure that the ange surfaces are clean and free from damage.
3. Centre the gasket properly over the ange. In retrot, use a pry bar to spread the ange apart
enough that the gasket will not be damaged when sliding in place.
4. Install all ange nuts and bolts.
5. Hand tighten.
6. Utilising a torque wrench, tighten all bolts to 20% nal torque specication following a “star”
pattern. (This means do not tighten bolts in order as a clock. This will result in a poor seat
between 12 o’clock and 1 o’clock.)
7. Tighten all bolts to 40% nal torque specication following a “star” pattern.
8. Tighten all bolts to 60% nal torque specication following a “star” pattern.
10. Tighten all bolts to 80% nal torque specication following a “star” pattern.
11. Tighten all bolts to 100% nal torque specication following a “star” pattern.
12. Following a sequential pattern, ensure that all bolts are tightened to 100% nal torque
specication.
13. It is important that all of the bolts are checked and re-torqued after the anges have been
heated and cooled down for the rst time.

Table of Contents

Related product manuals