EasyManua.ls Logo

Furuno CSH-5L - Pre-Amplifier Unit

Furuno CSH-5L
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. MOUNTING
1-13
1.2 Pre-amplifier Unit
Fix the pre-amplifier unit to the hull unit as follows:
1. Unfasten four hex. bolts (M6x12) to detach the mounting angles (2 pcs.) from the
pre-amplifier unit.
2. Fix the mounting angles onto the hull unit with M6x12 hex. bolts.
Hex. bolts are supplied with the hull unit.
3. Using the M6x12 bolts removed at step 1, fix the pre-amplifier unit to the mounting
angles.
Mounting angle (2 pcs.)
Pre-amplifier unit
M6x12, 8 pcs.
Mounting pre-amplifier unit

Other manuals for Furuno CSH-5L

Related product manuals