EasyManua.ls Logo

Furuno CSH-5L - Hull Unit;Pre-Amplifier Unit

Furuno CSH-5L
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. WIRING
2-3
2.2 Hull unit/Pre-amplifier Unit
2.2.1 Running transducer cable
Excessive stress should not be placed on the transducer cables (12 pcs.) during raise/lower
operation. Follow the procedure below to run the cables.
1. Fix the 12 transducer cables with the cable clamp [A].
Cable clamp [A]
Cable clamp [B]
Raise/lower
drive assembly
Cable clamp (1)
2. Temporarily fix cable clamp [B]. Note the positions of cable in clamps [A] and [B] as
shown below.
Cable
clamp [A]
Cable clamp [B]
Ex) The cable which is fixed at
(a) of the clamp [A] should be
wired to (a) of the clamp [B].
Cable clamp (2)

Other manuals for Furuno CSH-5L

Related product manuals