EasyManua.ls Logo

Furuno GP-80 - Page 88

Furuno GP-80
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B–2
Cable fabrication
1) Remove the outer sheath, armor, and shield as illustrated.
2) Remove the insulation of cores 3 mm.
3) Cut and solder unused cores to the shield.
4) Solder a ground wire to the shield.
5) Dress the shield and the outer sheath with heat shrink tube, leaving 30 mm of shield and
outer sheath exposed.
6) Heat the heat shrink tube.
7) Remove the insulation of NH connector (supplied) 3 mm.
8) Heat the heat shrink tube.
Figure B-2 How to fabricate the signal cable

Table of Contents

Other manuals for Furuno GP-80

Related product manuals