EasyManua.ls Logo

Gaggia Evolution E90 - Non-Scheduled Maintenance

Gaggia Evolution E90
248 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
8
68
Replace the lid and shift lever C3 from right to left and
allow the salted water to drain out of pipe F3 until the
water is fresh.
Shift lever D3 from right to left.
8.4 Non-scheduled maintenance
Unscheduled maintenance includes every repairing or part
replacing.
The Maintenance Technician is the only person authorized
to perform these operations.

Table of Contents

Related product manuals