CS 5000
User Manual
© 2009 GARRETT METAL DETECTORS 12 PN 1530100 REV H
3.2.2 Install the Power Cord completely through one of the channels at the top of either of the Panels as
shown below. A channel can be found in each of the four corners. Select the corner that will be
convenient in relation to site selection. For overhead power connection, do not insert the cable
through a channel but leave it free at the top.
If using cord set, it must be routed through the channel closest to the Power Module. Care should be
taken to prevent accidental disconnections and exposure to water.
3.2.3 Place the styrofoam packing material on floor as shown and lay the Detection Unit on it with the touch
pad panel facing down. Use four (4) of the Screws and Finishing Washers to connect the Detection
Unit to Panels A and B. Do not tighten.
3.2.4 Open door of the Detection Unit and, first, connect Power Cord. Then, connect Cable A and Cable B
to the Panels as shown.
PANEL B
POWER CORD OR
CORD SET
CABLE A
PANEL A
CABLE B