1200C-2000C Fire Alarm Control Panel, Repeater, and Black Box Installation Manual 25
Starting up on battery power
If mains power is not available the control panel may be powered up using battery
power. To do this, press the battery startup button on the PS1200N power supply
interface module (see Figure 18 on page 20).
Third-source power supply
An optional 9V PP3 battery may be installed as a third-source power supply. The
third-source battery is connected to the FC1200N or FC2012 host CPU module.

Other manuals for GE Security 1200C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Security 1200C and is the answer not in the manual?

GE Security 1200C Specifications

General IconGeneral
BrandGE Security
Model1200C
CategoryControl Panel
LanguageEnglish

Related product manuals