EasyManua.ls Logo

GE 469

GE 469
336 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
469 MOTOR MANAGEMENT RELAY – INSTRUCTION MANUAL 1–1
469 Motor Management Relay
Chapter 1: Getting Started
Digital Energy
Multilin
Getting Started
1.1 Important Procedures
1.1.1 Cautions and Warnings
Please read this chapter to guide you through the initial setup of your new relay.
Before attempting to install or use the relay, it is imperative that all
WARNINGS and CAUTIONS in this manual are reviewed to help
prevent personal injury, equipment damage, and/or downtime.
1.1.2 Inspection Checklist
Open the relay packaging and inspect the unit for physical damage.
View the rear nameplate and verify that the correct model has been ordered.
Ensure that the following items are included:
– Instruction Manual
– GE EnerVista CD (includes software and relay documentation)
– mounting screws
For product information, instruction manual updates, and the latest software updates,
please visit the GE Multilin website at http://www.GEmultilin.com.
Note
If there is any noticeable physical damage, or any of the contents listed are missing, please
contact GE Multilin immediately.
WARNING

Table of Contents

Other manuals for GE 469

Related product manuals