AF-70 LP
Mechanical Installation
Mechanical Dimensions
3
11
10
3.7. GlandPlateandLockOff
TheuseofasuitableglandsystemisrequiredtomaintaintheappropriateIP/Nemarating.Theglandplatehaspremouldedcableentry
holesforpowerandmotorconnectionssuitableforusewithglandsasshowninthefollowingtable.Whereadditionalholesarerequired,
thesecanbedrilledtosuitablesize.Pleasetakecarewhendrillingtoavoidleavinganyparticleswithintheproduct.
CableGlandrecommendedHoleSizes&types:
Power&MotorCables
Control&SignalCables
MouldedHole
Size
ImperialGland
MetricGland
KnockoutSize
ImperialGland
MetricGland
Driveunitsize1
22mm
PG13.5
M20
22mm
PG13.5
M20
Driveunitsize2&3
27mm
PG21
M25
22mm
PG13.5
M20
FlexibleConduitHoleSizes:
DrillSize
TradeSize
Metric
Driveunitsize1
28mm
¾in
21
Driveunitsize2&3
35mm
1in
27
ULratedingressprotection("Type")isonlymetwhencablesareinstalledusingaULrecognizedbushingorfittingforaflexible-
conduitsystemwhichmeetstherequiredlevelofprotection("Type")
ForconduitinstallationstheconduitentryholesrequirestandardopeningtotherequiredsizesspecifiedpertheNEC
Notintendedforinstallationusingrigidconduitsystem
PowerIsolatorLockOff
Ontheswitchedmodelsthemainpowerisolatorswitchcanbelockedinthe‘Off’positionusinga20mmstandardshacklepadlock(not
supplied).
IP66/Nema4XGlandPlate
IP66/Nema4XUnitLockOff
3.8. RemovingtheTerminalCover
Toaccesstheconnectionterminals,thedrivefrontcoverneedstoberemovedasshown.
IP66/Nema4XUnits
Removingthe2screwsonthefrontoftheproductallowsaccesstotheconnectionterminals,asshownbelow.
3.9. RoutineMaintenance
Thedriveshouldbeincludedwithinthescheduledmaintenanceprogramsothattheinstallationmaintainsasuitableoperatingenvironment,
thisshouldinclude:
Ambienttemperatureisatorbelowthatsetoutinthe“Environment”section.
Heatsinkfansfreelyrotatinganddustfree.
TheEnclosureinwhichthedriveisinstalledshouldbefreefromdustandcondensation;furthermoreventilationfansandairfilters
shouldbecheckedforcorrectairflow.
Checksshouldalsobemadeonallelectricalconnections,ensuringscrewterminalsarecorrectlytorqued;andthatpowercableshavenosigns
ofheatdamage.