151
Voltage dips, short 
interruptions and 
voltage variations on 
power supply lines
IEC 61000-4-11
<5% U
T
(>95% dip in U
T
)
for 0.5 cycle
40% U
T
(60% dip in U
T
)
for 5 cycles
70% U
T
(30% dip in U
T
)
for 25 cycles
<5% U
T
(>95% dip in U
T
)
for 5 sec
<5% U
T
(>95% dip in U
T
)
for 0.5 cycle
40% U
T
(60% dip in U
T
)
 for 5 cycles
70% U
T
(30% dip in U
T
)
for 25 cycles
<5% U
T
(>95% dip in U
T
)
for 5 sec
Mains power quality should be that of a typical 
commercial or hospital environment. If user of the 
equipment requires continued operation during 
power mains interruptions, it is recommended 
that the equipment be powered from an 
uninterruptible power supply or a battery.
Power frequency (50/60 
Hz) magnetic field
IEC 61000-4-8
3 A/m 3 A/m Power frequency magnetic field should be at 
levels characteristic of a typical location in a 
typical commercial or hospital environment.
NOTE U
T
 is the a.c. mains voltage prior to application of the test level.