Electrical Connection
24
User Manual V1.3-2022-11-18
Inverter
PV String
*0
Utility Grid
Loads
Circuit
Breaker
Circuit
Breaker
0HWHU
Power Limit Network
GM1000
CT90
The PV station generates power for self-consumption, but the electric equipment cannot
consume all the generated power. The inverter can monitor the on-grid electric data in real-time
and adjust the output power via a smart meter to avoid the residual current feeding back to the
utility grid.
6.5 Communication
6.5.1 Communication Network Introduction
Both the current sampling accuracy error margin of CT and the output voltage sampling
accuracy error margin of the inverter are ±1%, so the output power sampling accuracy error
margin of the inverter is ±2%.
Inverter
PV String
Utility Grid
Loads
Circuit
Breaker
Circuit
Breaker
0HWHU

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE GEP and is the answer not in the manual?

GE GEP Specifications

General IconGeneral
BrandGE
ModelGEP
CategoryInverter
LanguageEnglish

Related product manuals