EasyManua.ls Logo

GE GL 311 F3/4031 P/VE - Connecting the Operating Mechanisms and Pole Columns

GE GL 311 F3/4031 P/VE
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
REV7 /REV7 OI 250 (EN) 43 / 146
6.9.4 Connecting the Operating Mechanisms and Pole Columns
Lubricate the shaft of pole B as per L2.
Fit lever B (6) onto the shaft of pole B (2).
Apply locking adhesive S1 to the screw (9). Secure the lever with
the screw (9) and washer (10).
Tighten to a torque of 35 Nm.
Insert the drive rod (5) into lever B (6).
Turn lever B (6) in the direction of the arrow until the lever and the
shaft are in contact with one another. This reduces the clearance
between the lever and the shaft.
Pull on the drive rod to reduce the clearance between the drive
shaft and operating lever.
Check to make sure the holes in the lever and drive rod are
aligned. If required align the pole columns using a tire lever. (see
“Aligning the Pole Columns Using a Tire Lever (if required)”
on Page 44)
2Pole 1x
5 Drive rod 1x
6 Lever 1x
9 Hexagon screw, M10x25 A2-70 1x
10 Washer, 50.5/11/3 1x
11 Locking sleeve 1x
12 Washer, 6 A2 1x
13 Hexagon screw, M6x16 A2-70 1x
14 Flanged coupling pin, 16x68 1x
15 Sleeve 1x
BA-P-2042990-HEBEL
2
10
12
13
5
6
11
14
15
9

Table of Contents

Related product manuals