COMMISSIONING
REV7 /REV6 OI 250 (EN) 59 / 146
7.6 Functional Testing
7.6.1 Test Operations
Carry out five closing and five opening operations by remote
control.
7.6.2 Measuring the Running Time of the Charging Motor
After each closing operation, the charging motor automatically re-
charges the closing spring.
Carry out a closing operation and measure the running time of the
charging motor.
Compare the running time with the reference values in the routine
test certificate and enter it in the checklist.
Operations at gas pressures below UW2 can result in mechani-
cal damage to the circuit breaker.
Therefore:
- Never operate the circuit breaker at gas pressures below
UW2 (red area on the density monitor indicator).
CAUTION
The pressurized components of the pole columns can be dama-
ged by improper handling. Such damage can cause the pole co-
lumns to burst as the result of breaker vibrations. This can result
in serious personal injury or property damage.
Therefore:
- Always carry out test operations from a protected positi-
on.
WARNING
Long-lasting applied voltage may damage the shunt release
coils.
Therefore:
- Connect coils only by way of the terminals provided.
- Apply voltage to the coils for no longer than three se-
conds.
CAUTION