EasyManua.ls Logo

GE GL 311 F3/4031 P/VE - Page 76

GE GL 311 F3/4031 P/VE
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSPECTION AND MAINTENANCE
76 / 146 OI 250 (EN) REV7 /REV3
The arcing contacts will exhibit wear due to the switching of normal
and short-circuit currents. The effective value of the short-circuit
breaking current is used to evaluate wear.
Reconditioning is necessary after 2,500 operations at rated normal
current or after a specific total breaking current (see figure) has be-
en reached.
Under certain operating conditions, such as operation of reactors
and capacitor banks (especially back-to-back conditions),
reconditioning will be necessary after fewer operations.
Special approval by GE is required for service under these condi-
tions.
CAUTION
40
2500
3,15
15
0
1
10
100
1 10 100 1000 10000
n
I / kA

Table of Contents

Related product manuals