3  INSTALLATION 
The  Hydran  M2-X  is  typically  installed  on  a  full-bore  gate  or  ball  valve  of  a 
transformer.  There are two cables: 
•  The Hydran M2-X’s power supply cable is passed in a flexible (recommended) or 
rigid steel conduit toward a supervisory control and data acquisition (SCADA) 
system. 
•  The  alarm  cable is  passed  in  a  flexible  (recommended)  or  rigid  steel  conduit 
toward a SCADA system.  
  Mounting Locations of the Hydran M2-X 
A  Hydran  M2-X  monitor  can  be  installed  on  any  available  transformer  valve. 
However, care must be taken in selecting a suitable location while respecting the overall 
dimensions and weight of the monitor. 
To achieve optimal performance from the Hydran monitor, ensure that: 
•  The Hydran M2-X is installed on a single transformer valve.  The valve should 
have no internal restrictions, recommended to be installed full-bore gate valve 
or ball valve. 
•  GE recommends that all cables carrying; Power, Communications, analogue 
inputs and outputs, be run in either rigid steel conduit or flexible steel liquid 
tight armoured conduit.    
Figure 11 illustrates some typical valve locations that can be found on a transformer.  
These locations vary between transformers, but there are some valve locations on a 
transformer where the oil circulation is much better due to the nature of a transformer’s 
operation. 
The circulation of oil is generally the same in all transformers — the natural 
convection of the oil circulates from warm to cool as the transformer warms up.  The 
oil at the bottom is usually cooler than the top as it returns from the cooling system, as 
illustrated in Figure 11.