Page #59 background imageLoading...
Page #59 background image
GE HEALTHCARE VIVID FIVE
D
IRECTION 5273008-100, REVISION 8 BASIC SERVICE MANUAL
Chapter 3 System Setup 3 - 9
3-5-2-1 Back-end Processor Power Down (cont’d)
2.) The System-Exit window is displayed.
Figure 3-5 System Exit Window
3.) Using the Trackball or Select key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
amber.
5.) Disconnect the probes.Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
3-5-2-2 Scanner Shutdown
Disconnect the Mains Power Cable if necessary. For example: Relocating the scanner.
3-5-3 Transducer Connection
1.) Plug the probe connector into the probe port, then lock the probe.
NOTE: Please ensure that the probe latch is in an unlocked position before you connect the probe to the
system.
NOTE: It is not necessary to turn OFF power to connect or disconnect a probe.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ C5 Premium and is the answer not in the manual?

GE LOGIQ C5 Premium Specifications

General IconGeneral
BrandGE
ModelLOGIQ C5 Premium
CategoryMedical Equipment
LanguageEnglish