Appendix B - Settings and Signals
ORDINAL SIGNAL NAME ELEMENT NAME
DESCRIPTION
DDB_RECONFIGURATION_INTERLOCK
This must be energized (along with DDB 455 - inhibit C Diff) at the time that a relay configuration is changed from 3 ended to 2 ended
scheme. This usually should be driven from a 52-B contact of the CB connected to the line end that is taken out of service
Commissioning tests - automatically places relay in test mode
For IEC-870-5-103 protocol only, used for "Command Blocking" (relay ignores SCADA commands)
For IEC-870-5-103 protocol only, used for "Monitor Blocking" (relay is quiet - issues no messages via SCADA port)
Inhibit stage 1 overcurrent protection
Inhibit stage 2 overcurrent protection
Inhibit stage 3 overcurrent protection
Inhibit stage 4 overcurrent protection
Inhibit stage 1 earth fault protection
Inhibit stage 2 earth fault protection
Inhibit stage 3 earth fault protection
Inhibit stage 4 earth fault protection
Inhibit stage 1 undervoltage protection
Inhibit stage 2 undervoltage protection
Inhibit stage 1 overvoltage protection
Inhibit stage 2 overvoltage protection
Inhibit stage 1 residual overvoltage protection
Inhibit stage 2 residual overvoltage protection
Inhibit thermal overload protection
Inhibit circuit breaker state monitoring (no alarm for defective/stuck auxiliary contact)
Inhibit circuit breaker fail protection
Inhibit Broken conductor protection
Inhibit VT supervision (including turn OF MCB’s) via PSL
Inhibit CT supervision (both differential and standard CTS) via PSL
Inhibit checksync. (Both stages and for each CB)
Inhibit trip on reclose (TOR)
Inhibit switch onto fault (SOTF)
To disable differential CTS via PSL