EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 5 - Components and functions (theory) 5 - 75
5-10-4-3 Forced Power Down
NOTE: In case of total lockup of the system, hold the ON/OFF button down a few seconds to turn the
system off.
Forced Power Down is initiated by depressing the ON/OFF button on the keyboard for a few seconds,
until the power down sequence starts:
1.) BEP detects long-term contact of Power (ON/OFF) switch.
2.) PSON_N goes high. This trigs the Main Power Supply to shut down the output voltages.
3.) Controller ACFAIL_N output signal goes low.
4.) Controller TS_OK output signal goes low.
5.) Controller turns OFF the TS (Transmit) voltages.
6.) Controller turns OFF the PMX (Probe MUX) voltages.
7.) Controller turns OFF voltages +/-15, +/-6, +11V, +24V.
8.) ACFAIL_N output signal goes high.
9.) Controller turns OFF +48V.
5-10-4-4 Power Loss
A power loss may be due to:
The Mains Switch has been switched to OFF
The Mains cable has been disconnected
Brown-out or power loss (burnout)
If a power loss (or error) occur, all power distribution within the unit is lost.
NOTE: This shut down sequence will typically be less than 1 second from the power failure is detected
to all voltages have been shut down.

Table of Contents

Other manuals for GE Vivid E7

Related product manuals