EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 8 - Replacement procedures 8 - 23
8-4-12 Verifications after the software has been re-loaded
NOTE: DO NOT use this procedure if all partitions on the HDD have been erased during the software
load, but refer to: 8-4-11 "Setup after Software loading" on page 8-22.
NOTE: Use this procedure if only the software on C:\ has been updated or reloaded.
1.) With your recordings from before the software loading available, continue with the setup instructions
starting in: Section 3-6 "Configuration" on page 3-24. Correct the settings if needed.
2.) Continue with: Section 3-8 "Connectivity setup" on page 3-38. Based on your recordings, correct
the settings if needed.
3.) Continue with: Section 3-9 "Options Setup" on page 3-52. Based on your recordings, correct the
settings as needed.
4.) After a software load, you should always calibrate the Front End, as described in: Section 6-6 "DC
Offset Calibration (Front End Alignment)" on page 6-11.

Table of Contents

Other manuals for GE Vivid E7

Related product manuals