EasyManua.ls Logo

GE Vivid E7 - Page 374

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
8 - 58 Section 8-5 - Replacing Covers and Bumpers
8-5-17-2 Remove the Bulkhead Cover (cont’d)
8-5-17-3 Install the Bulkhead Cover
Follow these steps to install the Bulkhead Cover:
1.) Place the Bulkhead Cover’s mounting angle onto the lower edge of the bulkhead opening.
NOTE: Tuck any cables within the cover to avoid pinching the cables.
2.) Push the two upper tab locks into the openings in the Frame UI Carrier.
Figure 8-35 Bulkhead Cover removed
Figure 8-36 Install Bulkhead Cover
BULKHEAD
COVER
LOWER TAB
LOCKS
MOUNTING ANGLE
Tab locks

Table of Contents

Other manuals for GE Vivid E7

Related product manuals