EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
8 - 126 Section 8-6 - Top Console Parts Replacement Overview
8-6-20-3 Lower Frame Assembly installation procedure
Follow these steps to install the Lower Operator Panel Frame:
1.) Position the Lower Operator Panel Frame.
2.) Install the Upper Frame.
3.) Install the plastic Plate Washers on both side of the Bulkhead Bracket.
4.) Position the Bulkhead Bracket.
5.) Install the 5 screws to secure the Bulkhead Bracket.
6.) Install the XYZ Buttons Frame.
7.) Install the Palm Rest.
8.) Install the Main Cable at the Lower Operator Panel end.
9.) Install the Bulkhead Board.
10.)Install the Lower Operator Panel.
11.)Install the Upper Operator Panel/Touch Panel Assembly.
12.)Install the LCD Arm.

Table of Contents

Other manuals for GE Vivid E7

Related product manuals