IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
8 - 140 Section 8-6 - Top Console Parts Replacement Overview
8-6-25-3 J-Rail Assy installation procedure
1.) Slide the Wagon, A/N Drawer Sheet Met. Assy into the J-Rail w/Lining.
2.) Put a Shrink Tube onto the front tab.
3.) Bend down the tab.
4.) If needed, repeat the three steps above for the other J-Rail Assy.
5.) Position the Wagon AN Drawer Sheet Met. Assy below the UI Console as illustrated in Figure 8-122
"Wagon AN Drawer Sheet Met. Assembly" on page 8-138. Ensure that the wagon is running free,
before you tighten the screws in the next step.
6.) Install the six fixing screws M4 x 8, Torque: 2.5 Nm.
7.) Install the Alphanumeric Keyboard.
8.) Install the Lower OP Panel.
9.) Install the Upper OP Panel.