EasyManua.ls Logo

GE Vivid E7

GE Vivid E7
736 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 8 - Replacement procedures 8 - 147
8-6-28-2 Remove the Bulkhead Plate
The Bulkhead Plate is used to secure the Upper UI Frame to the Lower UI Frame.
1.) Remove the seven fixing screws (see: Figure 8-130 "The Bulkhead Plate" on page 8-147).
2.) Remove the Bulkhead Plate and the Cable Clamp.
8-6-28-3 Install the Bulkhead Plate
1.) Position the Bulkhead Plate so it aligns with the holes for the fixing screws.
2.) Install the seven fixing screws as described below:
- The two upper screws are M6 x 20, Torque: 8.5 Nm.
- The next screw is M6 x 45, Torque: 8.5 Nm.
- The lower left-most screw is M6 x 30, Torque: 8.5 Nm.
- The three other lower screws are M6 x 25, Torque: 8.5 Nm. Two of the screws are also fixing
the Cable Clamp (see: Figure 8-130 "The Bulkhead Plate" on page 8-147).
3.) Install the Operator Panel, Lower.
4.) Install the Bulkhead Board.
5.) Install the two Speaker assemblies.
6.) Install the Operator Panel, Upper.
7.) Install the Operator Panel Knobs.
Figure 8-130 The Bulkhead Plate

Table of Contents

Other manuals for GE Vivid E7

Related product manuals