EasyManua.ls Logo

GE Voluson P8 - Section 8-55 Replacement of UVC; 8-55-1 Manpower; 8-55-2 Tools; 8-55-3 Preparation

GE Voluson P8
620 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-169
Section 8-55
Replacement of UVC
8-55-1 Manpower
One person, 30 minutes
8-55-2 Tools
Philips screwdriver
8-55-3 Preparation
1.) Power Off/Shutdown the system as described in 4-3-2 "Power Off / Shutdown" on page 4-4
2.) Remove the rear covers and disconnect cables as described in 8-56-4 "Removal Procedure" on
page 8-172
8-55-4 Removal procedure
1.) Draw the DRFG out of the Nest Frame.
2.) Remove the nut (GPN:5549432) and washer (GPN:5549433).
Figure 8-241 Drawing the DRFG
Figure 8-242 Removing the nut and washer

Table of Contents

Other manuals for GE Voluson P8

Related product manuals