GE RAFT VOLUSON™ P8/VOLUSON™P6
DIRECTION 5775469, R
EVISION 3 DRAFT (JULY 19, 2018) BASIC SERVICE MANUAL
3-6 Section 3-3 - Receiving and Unpacking the Equipment
Section 3-3 Receiving and Unpacking the Equipment (cont?)
Figure 3-4 envelope at front panel of the crate
Table 3-5 Unpacking Procedure
Step Task
1.
Unbend the Packing box by cutting
Check whether delivery is complete
(according to packing list) and check visual damage!
The envelope with delivery address, packing list and
invoice is located on the front panel of the crate.