EasyManua.ls Logo

Gehl RS5-34 - Page 235

Gehl RS5-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler BOOM EXTEND CYLINDER
PRINTED IN U.S.A. 608-5 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
STEP 14
G0905034
Install the retainer bolt (1) and nut (2).
STEP 15
Remove the protective cover from the engine hood.
STEP 16
Remove the caps and plugs from the hydraulic
fittings and hoses.
STEP 17
G0905040
Reconnect the two hydraulic lines to the boom
extend cylinder and tighten.
STEP 18
Use a grease gun with the specified grease to
lubricate the forward and aft pin grease fittings.
STEP 19
Start the engine and check boom operation in a clear
area.
STEP 20
Shut off the engine. Check for hydraulic fluid leaks.
Correct any leakage problem found and add
hydraulic fluid as required.
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Related product manuals