EasyManuals Logo

Gehl RS5-34 Service Manual

Gehl RS5-34
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
RS5-34 Telescopic Handler ENGINE
PRINTED IN U.S.A. 201-3 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
STEP 9
G0905144
Open the radiator drain valve at the bottom of the
radiator. Drain the coolant into an approved
container.
STEP 10
G0905143
Open the engine block drain valve and drain the
coolant into an approved container.
NOTE:
Attaching a hose to the drain valves will help
direct the coolant to the container.
STEP 11
After all the coolant has drained, close both drain
valves. Recycle or dispose of coolant in an
environmentally safe manner.
STEP 12
G0905138
Remove the wire from the oil pressure sender on the
engine.
STEP 13
G0905139
Remove the throttle linkage (1) and the fuel shut-off
solenoid wires (2) from the fuel injector pump.
STEP 14
G0905086
Remove the throttle cable from the throttle cable
mount bracket.
2
1
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gehl RS5-34 and is the answer not in the manual?

Gehl RS5-34 Specifications

General IconGeneral
BrandGehl
ModelRS5-34
CategoryConstruction Equipment
LanguageEnglish

Related product manuals