EasyManua.ls Logo

Gehl Z27 - Page 123

Gehl Z27
232 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13. Operating Instructions
2-79
5) Clean the bucket boss section and install the O-ring.
IMPORTANT
Check that the O-ring is not damaged. If it is dam-
aged, replace it.
We recommend that you replace the O-ring when
you replace the bucket.
6) Connect the arm to hole (A), and then connect the link
to hole (B).
7) Install the O-ring in position.
IMPORTANT
Before mounting the bucket, clean the arm pin hole
and grease it.
8) Install the bolt into the bucket pins A and B.
9) Grease the connecting parts.
O-ring
Bucket
000446-00E
Bolt
Bucket pin
Nut
000447-00E

Table of Contents

Related product manuals