C. Gerhardt GmbH & Co. KG
2. Delivery
2.1. Check for transport damage
Before assembling the equipment please check it thoroughly! In case of any damage, please notify
your carrier (mail, rail, road) immediately and obtain an expert’s report!
The exact contents of the delivery can be checked by the following list.
2.2. Package list
1 x Distillation system VAPODEST 50, ready to use
1 x Printer (with instruction manual)
1 x Printer cable
1 x Electrode with screw plug connection
1 x Buffer solution pH 4.00, 250 ml
1 x Buffer solution pH 7.00, 250 ml
1 x KCL Electrolyte solution, 250 ml
Tubing set:
1 x Water inlet tube 10/17 with connections of ½ and ¾ inch, 2 m
1 x Verprene tube 8/12, 2 m
3 x PVC tube 4/7, 2 m
3 x PVC tube 8/12, 2 m
3 x PVC pipe 6x1, 42 mm
1 x PVC pipe 10x1, 420 mm
1 x Pen (to operate the Touch-Sensitive-Screen)
1 x Mains cable
1 x Kjeldatherm digestion tube, 250 ml
1 x Data transfer disk
1 x Instruction manual