EasyManua.ls Logo

GMG 3394-RT - Page 28

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section
3394RT---6094RT Scissor Lifts - Operator’s Manual Page 24
STEP 4
Remove the safety snap pins from main deck rail pan-
els that attach to the entry gates.
Lift the rails, pivot and place on top of the deck exten-
sion rails.
STEP 5
Remove the safety snap pins from remain deck rail
panels.
Lift the rails, pivot and place on top of the deck exten-
sion rails.
9 - Fold Down Platform Railings
4 places
4 places
To return the machine to normal operation mode, lift all rails into their upright position, install all
safety snap pins, and position the platform control box on the extension rail.

Other manuals for GMG 3394-RT

Related product manuals