EasyManua.ls Logo

GMI GT series - Service Due Date

GMI GT series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
CONFIGURATION & FIELD CALIBRATION
Warm-up Complete
The instrument will now automatically select the Leak
Test Mode, as default.
The following configurable options are available:
a) To start up in any selected other operational mode.
b ) To start up in the mode last used.
1.6 SWITCH THE INSTRUMENT OFF
To initiate the shut down sequence:
Press and hold both the LH (INVERT) and RH
(PUMP)
buttons simultaneously.
SWITCH INSTRUMEN
T
OFF
Fig. 1.26 Switch OFF

Other manuals for GMI GT series

Related product manuals