Commissioning Report
2
Commissioning
Report
F
or use with Kerosene only.
After installing the boiler leave these
instructions with the User.
This appliance is deemed a controlled
service and specific regional statutory
requirements may be applicable.
Date:
Commissioning engineer: Tel. No:
Boiler model/output: kW
Fuel type: Kerosene
Nozzle size: Pump pressure:
Air setting: Flue gas % CO
2
:
Net flue gas temp: Smoke No:
GRANT ENGINEERING (UK) LIMITED
Hopton House, Hopton Industrial Estate, Devizes, Wiltshire SN10 2EU
Tel: 01380 736920 Fax: 01380 736991
Email: sales@grantuk.com www.grantuk.com
This manual is accurate at the date of printing but will be superseded and should be disregarded if specifications and/or
appearances are changed in the interests of continued product improvement.
All good sold are subject to our official Conditions of Sale, a copy of which may be obtained on application.
© Grant Engineering (UK) Limited 2008. No part of this manual may be reproduced by any means without prior written consent.