EasyManua.ls Logo

Grant Vortex Eco - Default Chapter; Commissioning Report

Grant Vortex Eco
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning Report
2
Commissioning
Report
F
or use with Kerosene only.
After installing the boiler leave these
instructions with the User.
This appliance is deemed a controlled
service and specific regional statutory
requirements may be applicable.
Date:
Commissioning engineer: Tel. No:
Boiler model/output: kW
Fuel type: Kerosene
Nozzle size: Pump pressure:
Air setting: Flue gas % CO
2
:
Net flue gas temp: Smoke No:
GRANT ENGINEERING (UK) LIMITED
Hopton House, Hopton Industrial Estate, Devizes, Wiltshire SN10 2EU
Tel: 01380 736920 Fax: 01380 736991
Email: sales@grantuk.com www.grantuk.com
This manual is accurate at the date of printing but will be superseded and should be disregarded if specifications and/or
appearances are changed in the interests of continued product improvement.
All good sold are subject to our official Conditions of Sale, a copy of which may be obtained on application.
© Grant Engineering (UK) Limited 2008. No part of this manual may be reproduced by any means without prior written consent.

Table of Contents

Related product manuals