EasyManua.ls Logo

Gree GRS-CQ8.0Pd/NaEK - Electric Wiring

Gree GRS-CQ8.0Pd/NaEK
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
91
Prepare the materials according to the above joints dimension. If cut-off valve is installed outside
the room, PPR pipe is recommended to avoid freeze damage.
Waterway pipelines can’t be installed until water heater unit is fixed. Do not let dust and other
sundries enter into pipeline system during installation of connection pipes.
After connection of all waterway pipelines, perform leakage test firstly. After that, perform heat
preservation of waterway system; meanwhile, pay more attention to valves and pipe joints. Ensure
enough thickness of insulated cotton. If necessary, install heating device for pipeline to prevent the
pipeline from freezing.
Hot water supplied from insulated water tank depends on pressure of water tap, so there must
be supply of tap water.
During using, the cut-off valve of cooling water inlet of water tank should be kept normally on.
4.9 Electric Wiring
(1)
Wiring diagram: indoor unit
GRS-CQ8.0Pd/NaE-K(I),GRS-CQ10Pd/NaE-K(I) ,GRS-CQ12Pd/NaE-K(I) ,GRS-CQ14Pd/NaE
-K(I) ,GRS-CQ16Pd/NaE-K(I)

Table of Contents

Related product manuals