EasyManua.ls Logo

GreenMech CHIPMASTER 220 - Preparing for Transport on Completion of Work

Default Icon
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CM220 Chipper 5. OPERATION 5-4
©GreenMechLtd 5-4 08/17
5.6 Preparing for Transport on Completion of
Work
Check that engine has stopped and chipper flywheel is
stationary.
Remove surplus material from infeed chute and machine
surfaces.
Lift up infeed chute to transport position, secure with catch
and fit locking pin (fig 5.6.2).
Set discharge flap into lowest position and tighten clamp.
Release clamps, turn discharge chute to forward position
in line with trailer, tighten clamps.
Raise support leg and secure with clamp (Fig 5.6.1).
If detached, re-attach trailer to vehicle.
CAUTION! Remember to raise support leg
before driving off.
Fig 5.6.1 Support Leg raised
Support leg
raised
Fig 5.6.2 Transport position (drawbar not shown)