7 Commissioning
Do not disconnect the PV&BAT connectors under load.
Improper operation during the wiring process can cause fatal injury to operator
or unrecoverable damage to the inverter. Only qualified personnel can perform
the wiring work.
Damage to the inverter due to moisture and dust penetration
Make sure the cable gland has been tightened firmly.
If the cable gland are not mounted properly, the inverter can be
destroyed due to moisture and dust penetration. All the warranty
claim will be invalid.
Requirements:
The AC cable is correctly connected.
The PV&BAT connectors are correctly connected.
The country is set incorrectly.
7.1 Start the inverter
7.1.1 Touch control
Switch display or Number +1
Confirm Country/Aera or
recover defaut value
7.1.2 Set Country/Area
Country setting
Before starts up the inverter,we need to select the right
Country/Area,if we don’t select any Country/Area, the inverter
will run under AS/NZS4777.2 as default for Australia,or run
under VDE0126-1-1 for other region after 30s.